ROOF CONDITION REPORT — CASCADE LOGISTICS CENTER (DEMO/FICTIONAL) Consultant survey April 2026. System: Carlisle 60-mil TPO, installed 2005 (21 years in service; typical service life 20–25 years for this assembly). Condition: FAIR overall. Seam failure repaired April 2026 at HVAC curb over Unit W-1 (aisle 14). Membrane thinning at high-traffic walk pads; two field seams flagged for monitoring. Core cuts dry. Recommendation: annual infrared survey; budget full replacement in the 2028–2031 window, planning ESTIMATE $1,680,000 (210,500 SF).