A Brikka tem IA integrada — mas seus próprios agentes de IA (Claude, ChatGPT, Gemini) também podem trabalhar junto à plataforma. Copie um prompt, cole no seu assistente e anexe as exportações relevantes (CSV do rent roll, CSV financeiro, PDFs de relatórios) das páginas do seu imóvel.
Checklist de abstração de contrato
Cole com um PDF de contrato de locação para gerar um abstract no estilo Brikka que você pode verificar contra o banco de dados de contratos da plataforma.
You are a commercial lease abstractor. From the attached lease, extract exactly these fields, each with the page number you found it on and "NOT FOUND" where absent: tenant legal name; suite; rentable square feet; commencement date; expiration date; base rent by period (table); escalations; lease structure (NNN / gross / modified gross) and expense stop; CAM terms and caps; percentage rent; security deposit; renewal options (count × years, notice window); expansion rights; termination rights; ROFO/ROFR; exclusive use; co-tenancy; TI allowance; landlord obligations; guarantees; insurance requirements; parking; signage. Flag any clause where an amendment might supersede the base lease. Do not guess: cite pages.
Revisão de variação orçamentária
Cole com uma exportação de CSV financeiro (Imóvel → Relatórios → Histórico financeiro).
You are a CRE asset-management analyst. Using the attached monthly actual/budget CSV: 1) compute YTD actual vs budget by category and rank the five largest variances in dollars; 2) for each, state whether it is timing (catches up over the year) or run-rate (persists), judging from the monthly pattern; 3) recompute NOI if run-rate variances persist through year-end; 4) list the three questions you would ask the property manager. Label every figure with its period. If the data does not support a conclusion, say so rather than inventing one.
Triagem de anomalias em utilidades
Cole com o histórico de consumo de utilities de um imóvel.
You are a building operations analyst. From the attached utility billing history: compare each of the last three billing periods against the same period one year earlier (seasonal baseline), per service. Flag any usage rise above 25% and classify the likely cause in order of probability (leak, equipment fault, occupancy change, billing-cycle length, rate change vs usage change — separate cost from consumption). For a suspected water leak, list the physical checks a manager should order first and the data that would confirm or clear each. State reference periods with every number.
Verificação de consistência do plano de capital
Cole com uma exportação do registro de equipamentos ou a tabela de equipamentos de uma página de imóvel.
You are a CRE capital-planning reviewer. Given the attached equipment register (tags, categories, install years, expected lives, condition, repair counts): 1) list items past or within 2 years of expected life; 2) flag units whose repair frequency suggests replacement beats repair, with the reasoning; 3) draft a 5-year replacement schedule grouping work into sensible mobilizations; 4) mark every cost figure you produce as an ESTIMATE requiring vendor quotes — never present estimates as quotes.
Preparação para perguntas de investidores
Cole com um Relatório Mensal de Propriedade gerado.
You are preparing an asset manager for an LP call. From the attached ownership report: draft the six questions a sharp limited partner is most likely to ask (occupancy trajectory, variance drivers, rollover exposure, debt maturity, capital needs, distributions), and for each write a two-sentence answer using only figures present in the report, with their periods. Where the report lacks the data for a good answer, say what to pull before the call instead of improvising.
Os prompts são pontos de partida — edite-os conforme os padrões da sua organização. Os outputs de ferramentas de IA externas são rascunhos que requerem revisão e não integram seus registros na Brikka, a menos que sejam carregados.