面向商业地产的AI操作系统。
添加物业
菜单
投资组合 + 添加物业 创建账户 登录 工作原理 金融工具 资讯 学习 询问数据 AI智能体
关于 关于我们 联系人 免责声明
图像与主题 黄昏 ✓ 日光 常青 石墨
账户
您正在浏览演示投资组合

此处内容不归属于任何账户——这是一个供浏览的虚拟投资组合。请创建账户以管理您自己的物业。

登录 创建账户
深色模式
图像与主题

四种风格——摄影图像与配色同步切换。

黄昏 ✓ 日光 常青 石墨
演示工作区

此工作空间内的所有物业、租户、文件及数据均为虚构。会影响真实记录的操作均有明确标注。

界面语言
示例数据 — 您正在浏览一个操作示例。您的实际物业将在此位置呈现。 创建您的账户

AI智能体

Brikka 内置 AI——同时您自己的 AI 代理(Claude、ChatGPT、Gemini)亦可与平台协同工作。复制提示词,粘贴至您的助手,并附上从物业页面导出的相关文件(租户名册 CSV、财务数据 CSV、报告 PDF)即可。

租约摘要清单

粘贴租约 PDF,生成可与平台租约数据库核对的 Brikka 格式摘要。

You are a commercial lease abstractor. From the attached lease, extract exactly these fields, each with the page number you found it on and "NOT FOUND" where absent: tenant legal name; suite; rentable square feet; commencement date; expiration date; base rent by period (table); escalations; lease structure (NNN / gross / modified gross) and expense stop; CAM terms and caps; percentage rent; security deposit; renewal options (count × years, notice window); expansion rights; termination rights; ROFO/ROFR; exclusive use; co-tenancy; TI allowance; landlord obligations; guarantees; insurance requirements; parking; signage. Flag any clause where an amendment might supersede the base lease. Do not guess: cite pages.

预算差异审查

粘贴财务 CSV 导出文件(物业 → 报告 → 财务历史)。

You are a CRE asset-management analyst. Using the attached monthly actual/budget CSV: 1) compute YTD actual vs budget by category and rank the five largest variances in dollars; 2) for each, state whether it is timing (catches up over the year) or run-rate (persists), judging from the monthly pattern; 3) recompute NOI if run-rate variances persist through year-end; 4) list the three questions you would ask the property manager. Label every figure with its period. If the data does not support a conclusion, say so rather than inventing one.

公用事业异常排查

粘贴某一物业的水电费账单历史。

You are a building operations analyst. From the attached utility billing history: compare each of the last three billing periods against the same period one year earlier (seasonal baseline), per service. Flag any usage rise above 25% and classify the likely cause in order of probability (leak, equipment fault, occupancy change, billing-cycle length, rate change vs usage change — separate cost from consumption). For a suspected water leak, list the physical checks a manager should order first and the data that would confirm or clear each. State reference periods with every number.

资本支出计划合理性核查

粘贴设备台账导出文件或物业页面中的设备表格。

You are a CRE capital-planning reviewer. Given the attached equipment register (tags, categories, install years, expected lives, condition, repair counts): 1) list items past or within 2 years of expected life; 2) flag units whose repair frequency suggests replacement beats repair, with the reasoning; 3) draft a 5-year replacement schedule grouping work into sensible mobilizations; 4) mark every cost figure you produce as an ESTIMATE requiring vendor quotes — never present estimates as quotes.

投资人问询准备

粘贴生成的月度所有权报告。

You are preparing an asset manager for an LP call. From the attached ownership report: draft the six questions a sharp limited partner is most likely to ask (occupancy trajectory, variance drivers, rollover exposure, debt maturity, capital needs, distributions), and for each write a two-sentence answer using only figures present in the report, with their periods. Where the report lacks the data for a good answer, say what to pull before the call instead of improvising.

提示词仅为起点——请按组织标准自行调整。外部 AI 工具的输出结果均为草稿,须经审核,除非上传,否则不构成您的 Brikka 记录。