The AI operating system for commercial real estate.
Add property
Menu
Portfolio + Add a property Create account Sign in How It Works Financial Tools News Learn Ask the Data AI Agents
About About us Contact Disclaimer
Imagery & theme Dusk Daylight ✓ Evergreen Graphite
Account
You are browsing the demo portfolio

Nothing here belongs to an account — it is a fictional portfolio to look around in. Create an account to manage your own properties.

Sign in Create account
Dark mode
Imagery & theme

Four looks — photography and colors change together.

Dusk Daylight ✓ Evergreen Graphite
Demo workspace

All properties, tenants, documents and figures in this workspace are fictional. Actions that would change a real record are clearly marked.

Interface language
Sample data — you are walking through a worked example. Your own properties would sit in its place. Create your account

Cascade Logistics Center

8811 S 212th Street, Kent, WA 98032 · Industrial · 210,500 SF · Built 2005 · Cascade Industrial Holdings LLC

Building equipment register 10

TagSystemMake / model CapacityInstalledAgeExpected life ConditionServesLast service Repairs 18moReplacement window
DOCK-1
S/N RH-8801
Other Rite-Hite RHH-4000 40,000 lb leveler · — 2005 21 yrs 25 yrs Good Dock position 1 Dec 03, 2025 0
DOCK-2
S/N RH-8802
Other Rite-Hite RHH-4000 40,000 lb leveler · — 2005 21 yrs 25 yrs Good Dock position 2 Dec 03, 2025 0
DOCK-3
S/N RH-8803
Other Rite-Hite RHH-4000 40,000 lb leveler · — 2005 21 yrs 25 yrs Fair Dock position 3 Dec 03, 2025 0
DOCK-4
S/N RH-8804
Other Rite-Hite RHH-4000 40,000 lb leveler · — 2005 21 yrs 25 yrs Good Dock position 4 Dec 03, 2025 0
DOCK-5
S/N RH-8805
Other Rite-Hite RHH-4000 40,000 lb leveler · — 2005 21 yrs 25 yrs Good Dock position 5 Dec 03, 2025 0
DOCK-6
S/N RH-8806
Other Rite-Hite RHH-4000 40,000 lb leveler · — 2005 21 yrs 25 yrs Good Dock position 6 Dec 03, 2025 0
FPU-1
S/N PT-3319
Fire Patterson 8x6 fire pump 1000 GPM · 460V 2005 21 yrs 30 yrs Good ESFR sprinkler system May 08, 2026 0
ROOF-1
S/N —
Roof Carlisle TPO 60-mil 210,500 SF membrane · — 2005 21 yrs 22 yrs Fair Entire building Apr 10, 2026 1 2028–2031
RTU-A
S/N TR-40112
HVAC Trane YSC036 3 tons · 460V 3ph 2014 12 yrs 18 yrs Good Office area W-1 Feb 12, 2026 0
RTU-B
S/N TR-40113
HVAC Trane YSC036 3 tons · 460V 3ph 2014 12 yrs 18 yrs Good Office area W-2/W-3 Feb 12, 2026 0

Records shown were entered or verified by the team (photo-based AI extraction with confidence levels arrives in the Building Intelligence phase; corrected values always become the authoritative record).

Warranties

ItemEquipmentProvider CoverageExpiresStatusNotes
TPO roof membrane (210,500 SF)ROOF-1Carlisle SynTec 20-year NDL (no dollar limit) system warrantyJun 01, 2025 Expired EXPIRED — repairs after expiry are at owner cost; retain for claim history
Claims: Carlisle warranty services

Check warranty status before authorizing work — a repair billed on covered equipment is money given away, and some warranties are voided by unapproved service.

Capital plan

ItemTimingAmountBasisNotes
Warehouse LED high-bay retrofitOct 2024 $96,000 actual · vendor quote Utility rebate received
TPO roof replacement (210,500 SF)Jun 2029 $1,680,000 planned · estimate Roof consultant condition report Apr 2026; window 2028–2031

Planned amounts are labeled by basis — vendor quote vs estimate — and feed the 5/10-year capital forecast conversation with the AI assistant.