Cascade Logistics Center
8811 S 212th Street, Kent, WA 98032 · Industrial · 210,500 SF · Built 2005 · Cascade Industrial Holdings LLC
Building equipment register 10
| Tag | System | Make / model | Capacity | Installed | Age | Expected life | Condition | Serves | Last service | Repairs 18mo | Replacement window |
|---|---|---|---|---|---|---|---|---|---|---|---|
| DOCK-1 S/N RH-8801 |
Other | Rite-Hite RHH-4000 | 40,000 lb leveler · — | 2005 | 21 yrs | 25 yrs | Good | Dock position 1 | Dec 03, 2025 | 0 | — |
| DOCK-2 S/N RH-8802 |
Other | Rite-Hite RHH-4000 | 40,000 lb leveler · — | 2005 | 21 yrs | 25 yrs | Good | Dock position 2 | Dec 03, 2025 | 0 | — |
| DOCK-3 S/N RH-8803 |
Other | Rite-Hite RHH-4000 | 40,000 lb leveler · — | 2005 | 21 yrs | 25 yrs | Fair | Dock position 3 | Dec 03, 2025 | 0 | — |
| DOCK-4 S/N RH-8804 |
Other | Rite-Hite RHH-4000 | 40,000 lb leveler · — | 2005 | 21 yrs | 25 yrs | Good | Dock position 4 | Dec 03, 2025 | 0 | — |
| DOCK-5 S/N RH-8805 |
Other | Rite-Hite RHH-4000 | 40,000 lb leveler · — | 2005 | 21 yrs | 25 yrs | Good | Dock position 5 | Dec 03, 2025 | 0 | — |
| DOCK-6 S/N RH-8806 |
Other | Rite-Hite RHH-4000 | 40,000 lb leveler · — | 2005 | 21 yrs | 25 yrs | Good | Dock position 6 | Dec 03, 2025 | 0 | — |
| FPU-1 S/N PT-3319 |
Fire | Patterson 8x6 fire pump | 1000 GPM · 460V | 2005 | 21 yrs | 30 yrs | Good | ESFR sprinkler system | May 08, 2026 | 0 | — |
| ROOF-1 S/N — |
Roof | Carlisle TPO 60-mil | 210,500 SF membrane · — | 2005 | 21 yrs | 22 yrs | Fair | Entire building | Apr 10, 2026 | 1 | 2028–2031 |
| RTU-A S/N TR-40112 |
HVAC | Trane YSC036 | 3 tons · 460V 3ph | 2014 | 12 yrs | 18 yrs | Good | Office area W-1 | Feb 12, 2026 | 0 | — |
| RTU-B S/N TR-40113 |
HVAC | Trane YSC036 | 3 tons · 460V 3ph | 2014 | 12 yrs | 18 yrs | Good | Office area W-2/W-3 | Feb 12, 2026 | 0 | — |
Records shown were entered or verified by the team (photo-based AI extraction with confidence levels arrives in the Building Intelligence phase; corrected values always become the authoritative record).
Warranties
| Item | Equipment | Provider | Coverage | Expires | Status | Notes |
|---|---|---|---|---|---|---|
| TPO roof membrane (210,500 SF) | ROOF-1 | Carlisle SynTec | 20-year NDL (no dollar limit) system warranty | Jun 01, 2025 | Expired | EXPIRED — repairs after expiry are at owner cost; retain for claim history Claims: Carlisle warranty services |
Check warranty status before authorizing work — a repair billed on covered equipment is money given away, and some warranties are voided by unapproved service.
Capital plan
| Item | Timing | Amount | Basis | Notes |
|---|---|---|---|---|
| Warehouse LED high-bay retrofit | Oct 2024 | $96,000 | actual · vendor quote | Utility rebate received |
| TPO roof replacement (210,500 SF) | Jun 2029 | $1,680,000 | planned · estimate | Roof consultant condition report Apr 2026; window 2028–2031 |
Planned amounts are labeled by basis — vendor quote vs estimate — and feed the 5/10-year capital forecast conversation with the AI assistant.